Two trailers.
One response.
A proposed site arrangement and functional controls review. Routing is schematic: there are no approved separation distances, hose lengths, setpoints or field operating instructions in this study.
Keep the paths distinct.
Bulk water moves to an authorized receiver. DryForce circulates process air through a separately assessed drying zone. No floodwater enters the drying plant or potable fleet.
Highlighting changes emphasis only. The diagram does not authorize pumping and drying to begin simultaneously; the site assessment determines sequencing and isolation.
Define every boundary.
Connection IDs are concept identifiers. Final couplings, ratings, duct sizes and electrical interfaces remain supplier selections.
| ID | Interface | Current concept basis | Required design closure |
|---|---|---|---|
| W-01 | Pump suction | 6 in nominal hose study | Vacuum rating, inlet geometry, screen, suction conditions and NPSH review |
| W-02 | Pump discharge | 6 in nominal hose study | Pressure rating, restraint, hose losses, receiving capacity and discharge acceptance |
| A-01 | Process return | 20 in nominal layout reservation | Actual airflow, static pressure, filtration and contamination boundary |
| A-02 | Dry-air supply | 20 in nominal layout reservation | Duct distribution, temperature, airflow and moisture-load study |
| A-03 | Regeneration inlet | Separate outdoor-air path | Supplier inlet requirements, air quality and termination position |
| A-04 | Regeneration wet-air outlet | Separate outdoor exhaust path | Temperature, moisture, duct losses, condensation management and termination |
| PWR-01 | DryForce electrical supply | 19.7 kW connected-load study | Voltage / phase, kVA, starting demand, protection, earthing and switching |
| MON-01 | Monitoring / telemetry | Optional status reporting | Data record, signal loss and independent local protections |
Review the fault response.
Select a condition to inspect the candidate behavior. This viewer does not simulate PLC timing, setpoints or a certified protective system.
Specify the interfaces
Reconcile the proposed schedule with vendor flanges, hose kits, duct openings and the selected electrical architecture.
Write the cause & effect
Define protective inputs, independent devices, fault priorities, stop / cooldown behavior and reset requirements.
Prove the boundaries
Document supplier-approved tests for flow, airflow, signal loss, protective trips and loaded road mass.
Connection ownership, functional fault responses and acceptance evidence for the next engineering review.
Read design notes →