AmeriPro Environmental ServicesMODULAR INFRASTRUCTURE / CONCEPT DOCUMENTS

AmeriPro SmartTrap + GREX-1000 — Grease-to-Energy Concept

Concept Revision C · November 7, 2026 · Jeff Ricks

Proposed concept — not yet built. This is a recovery / feedstock-development study, not a fuel-production license, fabrication package or performance certification. Open the interactive concept or the Future Concepts hub.

1. Product chain

SmartTrap is a proposed automated commercial-kitchen grease-recovery device. GREX-1000 is a separate proposed permanent receiving, separation and dewatering facility housed in an available large building. Its initial product is an oil-rich candidate feedstock held for characterization and buyer qualification. Wastewater and solids remain managed residual streams.

Neither name asserts a tested hydraulic rating, registered trademark or approved plumbing installation. GREX-1000 does not establish 1,000 GPH, GPD or a 1,000-gallon batch. The first calculator uses a 1,000 kg wet-feed reference batch solely as an editable mass-balance example.

Keep used cooking oil, SmartTrap skimmings, bulk interceptor pumpings and chemically contaminated wastes separately identified. Do not blend unknown streams before establishing acceptance and receiving criteria. The lipid, water, solids, free-fatty-acid and contaminant content can materially change the process and product value.

2. SmartTrap functional design

TagCandidate functionRequired design closure
ST-1501Stainless interceptor body / separation zoneKitchen fixture demand, temperature, detergent conditions, materials and approved hydraulic sizing
SC-1501Removable food-solids basketCapture duty, cleaning access and service frequency
SK-1501Mechanical surface skimmerSeparation / recovery trials, mechanism and operating cycle
RC-1501Sealed removable recovery containerWorking capacity, compatible closure, access and handling
LIT-1501Interceptor liquid levelSensor suitability, fouling, alarm thresholds and failure detection
GIT-1501Grease-layer indicationMeasurement validity, calibration and cleaning
LSH-1501Collector-full detectionSkimmer inhibit, local alarm and service response
CP-1501Local controller / optional telemetryInterlocks, local independence, event log and service alerts

The device must remain a properly sized and maintained grease-control installation. Automatic skimming is not permission to eliminate required cleaning, inspections or service. Plumbing arrangement, venting, access, installation approval and applicable device testing require qualified review; no certified standard conformity is claimed.

A full recovery container should inhibit the recovery mechanism and signal service. The effect on continued kitchen use and interceptor hydraulic operation requires an approved design and site response. Do not invent a wastewater bypass or an automatic drain blockage as a substitute for that review.

3. GREX-1000 candidate process

Receiving / sampling → screening → controlled thermal conditioning where testing supports it → mechanical separation → product polishing / dewatering → segregated product hold → qualified feedstock shipment.

TagCandidate functionRequired design closure
TK-1601Receiving / equalization tankFeed acceptance, working volume, mixing, containment and sample points
STR-1601ScreenSolids / debris load and access
HX-1601Controlled conditioning / heat exchangeFeed-specific test basis, thermal duty, fouling, limits and independent protection
SEP-1601Additional oil / water recovery stage, equipment unselectedPhase behavior, emulsion response, throughput and tested partition yields
SCR-1601Existing custom inclined-screen / screw separatorCandidate front-end solids removal; confirm screen slots, flow, discharge arrangement and duty
FIL-1601Product polishingInsolubles / moisture goals, fouling and maintenance
TK-1602Oil-rich product holdSampling, temperature needs, compatibility, segregation and buyer qualification
TK-1603Aqueous residual holdingCharacterization, working capacity and authorized receiving path
PR-1601Existing custom PJDL-302 multi-disc screw pressFeed suitability, condition, trials, cake quality, press-liquor composition and oil losses
SC-1601Solids / wet-cake collectionWaste composition, handling, containment and receiving
CP-1601Local PLC / protective controlsLevel, flow, temperature and machine permissives / faults

No thermal setpoints, chemical dosing recipes, high-speed separator settings or fuel-conversion procedures are defined. The first development gate is representative-feed separation testing. Dissolved contaminants, emulsions, variability, odor and corrosion can require a different process or make a feed unacceptable.

This concept does not include solvent extraction, esterification, transesterification, hydrotreating or another chemical fuel-conversion process. Specialist downstream conversion is a separate possible pathway, not a capability of the receiving / separation facility.

3A. Stationary facility and existing equipment

AmeriPro has a large available building and an existing screw press and separator. This revision removes trailer and single-skid size constraints. Building suitability and equipment compatibility remain to be established; ownership alone does not establish capacity or process fit.

The provisional layout separates truck unloading / sampling, segregated receiving and quarantine, conditioning / separation, oil-rich product finishing and hold, solids handling, aqueous holding, utilities and maintenance access. Survey dimensions, floor condition / loading, containment and drainage, ventilation / odor management, electrical service, heat supply, truck movements and lifting / service clearances. Size storage from delivery peaks, operating hours, batch residence and shipment / residual collection intervals, not the illustration.

Existing separator (SCR-1601): AmeriPro's equipment guide describes an inclined wedge-wire screen, filtrate chamber, solids-conveying screw and timed vibrator. This is a photo / drawing interpretation of the custom solid-liquid separator, not an oil / water centrifuge specification. Assign it provisionally to front-end screening. Screen slot size, flow capacity, discharge-end settings and level-rod location remain unresolved. Its documented motor plate is 4 kW, 230 V, 60 Hz, S3-75%; continuous-duty suitability remains a maker question. The generic separator paperwork differs from the actual shared cabinet and must not be treated as its as-built design.

Existing screw press (PR-1601): the equipment guide identifies a Yangzhou Pujiang PJDL-302, custom-built for restaurant F.O.G., with two multi-disc screw shafts and polymer conditioning. Recorded nameplate values: 70–140 kg dry solids/hour, 2.05 kW press rating, 230 V / 60 Hz and 1,350 kg equipment weight. These are documented ratings, not verified grease-processing yields or a facility feed rate. The 2.05 kW excludes the separator and other connected loads; the weight is not an installed floor-load calculation. The general PJDL manual supplies no model-specific F.O.G. feed / cake targets.

Evaluate the press on a conditioned sludge branch after testing oil recovery before polymer addition. Measure lipid losses to screenings, press cake and filtrate and check any polymer effects on the intended product. Do not commit the whole incoming grease stream to polymer conditioning before comparing recovery paths. Keep press filtrate in characterized holding; recycle requires a complete balance and controlled return. Neither existing machine is demonstrated to produce a qualified oil-rich product.

Provisional routing and integration

Receiving / segregated holding → existing screen separator (SCR-1601) → screened-liquid equalization → trial-selected oil recovery (SEP-1601) → oil-rich product finishing / hold. A suitable residual sludge branch proceeds to polymer conditioning and PJDL-302 dewatering (PR-1601). Screenings, cake, press filtrate and aqueous residual remain separately measured and managed. This is a proposed routing for trials, not a confirmed existing installation.

Integrate the existing machines with the facility PLC only after an as-built wiring review and a defined feed-permissive and fault-response sequence for the whole line.

Run representative trials for feed variability, actual throughput, plugging / cleaning, energy, labor, consumables and complete phase yields. Compare using existing equipment, refurbishing it or purchasing new equipment. No purchase credit or recovery guarantee is assigned yet.

The calculator remains a simplified total-batch balance: its wet-cake assumption is not a press prediction, and it does not separately model press liquor, recycle or lipid losses in cake. Replace those assumptions with a measured multi-stream balance before facility sizing.

4. Why the product is not automatically No. 4 fuel oil

ASTM's fuel-oil specification overview describes No. 4 grades as heavy distillates or distillate / residual blends used in suitable commercial / industrial burners, with defined property requirements. Recovering fats from grease does not by itself demonstrate conformity to that specification. No. 4 fuel oil and marine fuel are also not interchangeable labels for any recovered oil.

USDA research describes brown-grease lipids as a potential biofuel feedstock with substantial free fatty acids. That supports investigating resource recovery; it does not establish that unconverted recovered grease is biodiesel, marine fuel, a burner-approved fuel or suitable for HybridForce-60's diesel generator.

Obtain an actual buyer and written specification before selecting the finishing train. Define representative sampling, water / sediment / insolubles, acidity / FFA, composition, source-specific contaminants and any other buyer / end-use tests. Fuel-specific properties and applicable requirements belong to the selected downstream use and conformity program, not this calculator.

5. Assumed batch mass balance

The calculator partitions feed into three mutually exclusive input categories: lipids, dry nonlipid solids and water. All entries are assumptions, not measured separation results. The product fractions are by mass; no gallon yield is calculated from an assumed generic density.

Default inputValue
Wet feed1,000 kg
Feed lipids15%
Feed dry nonlipid solids5%
Feed water by difference80%
Lipid recovery to oil-rich product85% of feed lipids
Water in oil-rich product2% of product mass
Solids in oil-rich product0.5% of product mass
Wet-cake dry nonlipid solids25% of cake mass

Recovered lipids = 1,000 × 15% × 85% = 127.5 kg. Oil-rich product = 127.5 / (1 − 2% − 0.5%) = approximately 130.77 kg. This contains about 2.62 kg water and 0.65 kg dry solids under the assumed fractions.

Remaining dry solids enter wet cake at the assumed 25% dry-solids fraction, yielding approximately 197.38 kg wet cake. Remaining water and all unrecovered lipids enter approximately 671.85 kg aqueous residual. Outputs sum to 1,000 kg within numerical rounding.

The model assigns no unrecovered lipid to cake, no dissolved-solid partition and no evaporation or chemical addition. This is a deliberately simple accounting scenario; actual phase compositions require trials and laboratory data. Inputs demanding more water or solids than are present are rejected. Mass closure does not demonstrate product quality or separator performance.

Reclaim-25 is not automatically an acceptable receiver for TK-1603 wastewater. Its washwater source envelope is a separate design. Establish actual residual composition, treatment needs and authorized receiving arrangements before connecting systems.

6. Candidate controls and storage

ConditionCandidate response / review need
Unknown / unacceptable receiving sampleSegregate or refuse feed; no automatic processing acceptance
Low level / loss of circulation during heatingInhibit heat or follow supplier-approved protective sequence
High temperatureIndependent protective response coordinated with thermal system
Separator protective faultFollow machine supplier sequence; retain containment and product hold
Product qualification pending / failedInhibit shipment to the intended buyer; identify retained batch
Receiving / residual / product high levelManage feed / transfers before overflow; consider process holdup and response time
Invalid sensor or power / communications lossDefined local safe state, no implied product-release permission

Tank capacities, batch runtime, heating duty, connected power, building layout, floor loading and operating inventory are not assigned in this revision. They must follow feed testing, vendor sizing and the intended operating schedule. The illustration's apparent fit does not establish a buildable layout or compatibility with a specific power trailer.

7. Development sequence

  1. Characterize separately collected SmartTrap skimmings and bulk interceptor pumpings; define unacceptable feeds.
  2. Obtain prospective buyer specifications and aqueous / solids receiving requirements before optimizing yield.
  3. Run representative separation / conditioning trials and document complete phase mass and quality data.
  4. Develop SmartTrap hydraulic / service design and approval path independently of the processing plant.
  5. Inventory and trial the existing separator and screw press; select reuse, refurbishment or replacement and size remaining equipment from tested duty data.
  6. Close site layout, utility, containment, service, machine protection and residual logistics designs.
  7. Replace allowances with supplier quotes and issue coordinated process drawings, controls matrix and acceptance protocol.

Primary references and provenance

External sources support general principles, not the numerical AmeriPro assumptions.