AmeriPro Environmental ServicesMODULAR INFRASTRUCTURE / CONCEPT DOCUMENTS

AmeriPro Reclaim-25 — Mobile Wastewater Recycling Trailer

Concept Revision A · November 7, 2026 · Jeff Ricks

Proposed process — the 25 GPM rate, treatment selections, dimensions and budget are design targets pending treatability testing and supplier review. WWR-25 / Reclaim-25 is the working designation. Open the interactive concept and water-balance planner.

1. First mission and stream boundaries

Start with captured vehicle / equipment washwater and compatible industrial cleanup streams whose composition is known and accepted through a source-specific review. This fits AmeriPro's fleet-washing and environmental-service work while establishing a defined first application.

The concept does not cover every wastewater stream. Raw sanitary sewage, concentrated grease-trap pumpings, solvents, reactive chemical mixtures, concentrated brines, unknown spill water and other uncharacterized waste require a separate acceptance decision and process design. Do not assume the trailer can accept those streams because it contains a membrane stage.

Stream / useInitial design position
Known fleet / equipment washwaterCandidate after source characterization and treatability testing
Compatible industrial washwaterCandidate only with defined feed envelope and end-use criteria
Raw sewage / blackwaterSeparate biological or other treatment concept; not included here
Concentrated grease-trap wasteSeparate handling / treatment; not an accepted feed assumption
Floodwater / spillwaterNo blanket acceptance; characterization and source-specific process review required
Recovered water for a defined nonpotable wash stageCandidate after qualification and applicable site approval
Drinking water / food-contact useNot a proposed product use
Storm-drain, surface-water or sewer dischargeNo authorization implied; receiver-specific requirements must be resolved

EPA's vehicle-wash guidance distinguishes basic grit / oil / grease separation from the additional treatment needed for further wash uses. Its washwater BMP emphasizes capture and management. The specific AmeriPro process below is a candidate developed from these principles, not an EPA-approved train.

2. Candidate treatment train

Captured feed → screening / grit removal → external equalization → free-oil separation / tested conditioning → candidate dissolved-air flotation → candidate UF → required polishing / disinfection → product hold / qualification → permitted nonpotable reuse.

Screenings, recovered oil, flotation sludge, membrane backwash / concentrate, cleaning wastes and off-spec product have distinct containment / receiving requirements. The diagram's main arrows omit these branch lines.

TagProposed packageSelection / validation need
CAP-1401Capture / collection kitSource segregation, capture area, sump and inflow profile
STR-1401Screen / grit separationOpening, solids burden, abrasion and cleaning access
TK-1401External equalization tankMixing, working volume, containment and feed variability
SEP-1401Free-oil separationOil condition and emulsion behavior; separation trial
CHEM-1401Conditioning provisionTest-selected pH / coagulation strategy if needed; no generic recipe
DAF-1401Dissolved-air flotation candidateTreatability, loading, recycle / air system, sludge handling and fit
UF-1401Membrane filtration candidateMaterial compatibility, sustainable flux, fouling, backwash and cleaning
POL-1401Product-specific polishing provisionWhether dissolved contaminants require adsorption, oxidation, other treatment or a different train
DIS-1401Disinfection provision where requiredValidated method, monitoring and source / end-use-specific targets
TK-1402External product holdSegregated storage, qualification, release controls and overflow prevention
TK-1403External liquid residual holdingWorking volume, waste compatibility and receiving / haul-off arrangements
CP-1401Controls / monitoringLocal protections, release permissives, logging and fault behavior

UF is not assumed to remove dissolved salts or every dissolved chemical. Clarity does not establish microbial or chemical suitability. Dissolved contaminants, detergent accumulation, scaling, corrosion, odor and aerosol exposure may limit the feasible reuse application. The candidate train contains no biological reactor and establishes no BOD, COD, ammonia, nutrient or pathogen-removal guarantee.

A sewage-focused MBR would be a separate fleet variant with a biological load basis, reactor volume, biomass startup / maintenance requirements and different residuals and power budgets. It is not interchangeable with this physicochemical washwater concept.

3. Source and product qualification

Before equipment selection, document the wash process, detergent SDS information, prior contaminants, source variability and intended reuse stage. Establish representative sampling with a qualified process reviewer. Potential parameters include flow, temperature, pH, suspended solids, oil / grease condition, organic loading, surfactants, conductivity / dissolved solids and source-specific chemical / microbial concerns. The final sampling list and numerical acceptance limits are not assigned here.

Use jar / separation trials and representative membrane / polishing tests as needed to establish feed compatibility, treatment response, waste production and product quality. Obtain applicable reuse and receiving requirements for the actual site and proposed use. This document supplies no universal treatment targets or discharge limits.

Product stays on hold while qualification is pending. A release permissive must reflect the selected treatment barriers, required monitoring and site criteria. Failed or invalid quality indication inhibits release; specify contained hold or approved reprocessing rather than a bypass to use. Avoid a recycling loop that repeatedly concentrates dissolved contaminants without a validated management strategy.

4. Water-balance planner

The planner is a constant-average volume model. Net product recovery is entered by the user, not predicted from treatment performance. The default is a proposed 25 GPM processing rate at 80% effective time over eight elapsed hours:

QuantityFull-schedule assumption / result
Average processing rate20 GPM
Scheduled feed capacity9,600 gal
Net product recovery assumption80%
Potential product across full schedule7,680 gal
Net liquid residuals across full schedule1,920 gal
Collection inflow during schedule18 GPM
Equalization working / initial inventory2,000 / 1,000 gal
Product working / initial inventory1,000 / 0 gal
Liquid residual working / initial inventory2,000 / 0 gal
Planned reuse demand during schedule7,000 gal, uniform only if release is assumed

Default hold scenario: product fills at 16 GPM while release is inhibited. The 1,000-gallon product tank fills after approximately 1.04 hours. Only 1,250 gallons of feed are modeled before that first tank intervention at averaged rates. The full-schedule feed and product values are capacity arithmetic, not achievable output without a changed hold / release / storage plan.

Assumed-qualified-release scenario: uniform demand draws 7,000 gal during eight hours. Net product accumulation is 680 gal over that schedule; the product tank would fill after approximately 11.76 elapsed operating hours at the same averaged rates. Equalization depletion and residual-tank filling both occur after approximately 8.33 hours. The eight-hour schedule fits those averaged balances; this does not establish actual release qualification or account for surges.

The first intervention can be equalization full, equalization depleted, product full or residual full. Initial inventory beyond capacity is rejected. Zero processing can still fill an equalization tank from continuing collection. Excess reuse demand is reported as unmet, not drawn from an empty product tank. After any intervention the process may need throttling, added storage, residual removal or rescheduling; the model does not simulate that change.

Chemical makeup, evaporation, rainfall, solids mass, density changes, irregular backwash batches and quality failure volumes are outside the model. Net recovery includes internal treatment losses at the stated feed-to-product boundary. Do not infer a sludge concentration or disposal classification from a liquid-volume difference.

5. Trailer and tank deployment

Candidate equipment body: 28 ft × 8 ft 6 in external width. Reserve eight feet for pretreatment, twelve feet for flotation / membrane equipment and eight feet for polishing / service interfaces. Overall road length, height, running gear, tow connection, partitions, access and service clearances require supplier layout review. No rooftop access platform is assumed from the fleet illustration.

External ground tanks provide 2,000 gal equalization, 1,000 gal product and 2,000 gal liquid-residual working capacity in the planner. Those 5,000 gallons would weigh approximately 41,700 lb at 8.34 lb/gal, independently of tank tare and actual wastewater density. Site bearing, support, containment, access and tank compatibility must be resolved. They are not transported full on the equipment trailer.

Transport groupAllocation, lb
Trailer / structure4,500
Flotation package, drained transport condition2,200
Membrane package, normal preservation / transport fluids included1,800
Screen / separator / pretreatment800
Pumps / piping650
Air system450
Controls / electrical650
Hoses / stowed accessories450
Integration / mounts / limited chemical and field kit allowance1,000
Proposed transport mass12,500
Additional on-board process holdup, 250 gal × 8.34 lb/gal2,085
Proposed on-site equipment mass14,585
Reserve to 16,000 lb project mass ceiling1,415

The 250-gallon operating holdup is an allocation, not verified package volume, and is additional to preservation fluids already in the transport budget. Ground tanks, capture hardware and residual haul-off logistics may require separate transport; they are not all included in the 450 lb stowed-accessory allowance. Confirm the full logistics manifest before purchasing a platform.

The project ceiling is not a certified GVWR. Wet / dry component data, actual residual liquid, chemical cargo, axle / hitch reactions, tires, supports and tow-vehicle ratings must be verified. Licensing: even the 12,500 lb transport mass is well over 10,000 lb, so Reclaim-25 needs Class A CDL drivers behind a typical 1-ton pickup (49 CFR 383.91: a towed unit over 10,000 lb GVWR in a combination rated 26,001 lb or more requires a Class A CDL; typical 1-ton pickups carry a manufacturer GCWR above 26,000 lb). Reaching a 9,990 lb plate would take a substantially lighter package or a split across two trailers; otherwise plan staffing around CDL drivers.

6. External-power allocation

Load groupConnected real-power allowance
Feed / transfer pumping2.0 kW
DAF recycle pumping3.0 kW
Air system2.2 kW
UF feed / recirculation4.0 kW
UF backwash package2.0 kW
Product pumping2.0 kW
Controls0.6 kW
Conditioning / dosing0.5 kW
Polishing / disinfection / auxiliary provision1.5 kW
Connected-load allowance17.8 kW

No diversity deduction is taken. Supplier selections may change loads or add equipment. Voltage / phase, motor starting, kVA, power factor, protection and permissible interruption remain unresolved. HybridForce-60 is a candidate external supply, not an approved match; its available real power alone cannot establish compatibility. No onboard generator is included in the Reclaim-25 mass or cost base.

7. Controls concept

ConditionCandidate functional responseRequired closure
Low equalization levelInhibit / limit feed outside approved pump conditionsSensor validity, thresholds, hysteresis and restart
High equalization levelAlarm and manage upstream collection without uncontrolled overflowCapture limits and site contingency
DAF / UF fault or invalid critical signalHold product release; follow package protective stateVendor fault interfaces and contained flow disposition
Product qualification pending / failedInhibit reuse releaseValidated monitoring / sampling and release authority
Product or residual tank high levelInhibit feed / manage flow to prevent overflowProcess holdup, response times, permitted storage and protective independence
Cleaning modeIsolate reuse path and contain cleaning wastesSupplier cleaning procedure, chemical compatibility and restart qualification
Power / communications lossNo assumed reuse permission; retain defined local protectionsValve failure positions, holdup disposition and controlled recovery

8. Next design gates

  1. Choose representative washwater sources, demand profiles and intended reuse stages.
  2. Characterize feed; establish end-use and receiving requirements with the responsible reviewers / authorities.
  3. Complete source-representative separation, flotation and membrane / polishing trials before freezing the train.
  4. Select package sizes, service dimensions, chemical inventories, recovery / waste rates and connected loads from vendor data.
  5. Close the complete trailer / ground-tank / collection / residual transport arrangement and mass budgets.
  6. Issue a coordinated P&ID, valve schedule, electrical single line, controls matrix and supplier-backed BOM; establish acceptance tests before a build release.

Primary references

These support general washwater-management and fit-for-purpose principles.