REV C PITCH DECK MWTP-50C ("KitchenShield-50C"): Split-Power Restaurant Water System
Slide 1 / 10
TWO TRAILERS · BOTH UNDER 10,000 LB · NO CDL · NO GROUND TANKS ON BOIL WATER JOBS

MWTP-50C: The Restaurant Water Plant Without the Generator

A 20-ft water trailer that runs on the restaurant's own 50A power and treats water with ultrafiltration plus virus-rated UV — paired with a separate PWR-25 generator trailer that only rolls when the power is out.

MWTP-50C UF · 186 mJ UV · 50A shore PLC · CHEM PWR-25 25 kVA · outage kit EVERY JOB OUTAGE JOBS ONLY
Kitchen Output
35 / 50 GPM
Continuous · peak, 60–75 PSI
Water Trailer Weight
7,310 lb
Road · 8,660 lb on site · 9,990 GVWR
Arrival to Water
~1.5 hr
No ground tanks on BWA jobs
System Cost
$253,920
$219,420 water + $34,500 PWR-25
01 • WHY SPLIT THE POWER OFF

A Kitchen Without Power Is Closed Anyway

Restaurants need city power to cook. On almost every restaurant job the building already has power — so an onboard generator mostly rides along unused.

1. Lighter, Simpler Water Trailer

No diesel, no fuel tank, no generator compartment, no transfer switch. On-site weight drops from 9,820 lb to 8,660 lb — a 1,330 lb margin under the 9,990 lb rating.

2. A Generator We Control

Rental generators disappear right after hurricanes and ice storms. An owned PWR-25 is always available — and one generator trailer backs up two or three water trailers.

3. A Healthier Engine

A diesel that runs a few weeks a year clogs its exhaust filter and won't start when needed. Between emergencies the PWR-25 works other AmeriPro jobs or runs monthly against a load bank.

Both trailers stay under 10,000 lb, each behind a standard 1-ton pickup — any trained AmeriPro technician with a regular license and DOT medical card can tow either one. No Class A CDL
02 • THE CUSTOMER

Where Bottled Water and Bagged Ice Break Down

During a Boil Water Advisory, most restaurants stay open on bottled water, bagged ice, disposables and a limited menu. The MWTP-50C is for the kitchens where that costs more than a deployment.

High-Volume Full Service & Hotels

Warewashing, ice and beverage volume that bottled water can't cover.

Multi-Unit Chains & Groups

Brand standards that don't allow a degraded menu or paper service.

Institutional Kitchens

Nursing homes, assisted living, schools and correctional facilities that can't send residents elsewhere.

Food Processors & Commissaries

Production lines that stop without potable water.

Built-in sales channel: AmeriPro already services these kitchens for F.O.G. grease-trap pumping and exhaust hood cleaning. Route technicians know the owner, the back alley, the water shutoff and the downstream sewer cleanout — and the 50A outlet and service-line tee go in during the same site survey.
03 • REV C TREATMENT TRAIN

Six Stages, Nothing on the Ground

City water feeds the plant directly through a backflow preventer, and UV carries the virus kill — so the break tank and contact tank stay home on Boil Water Advisory jobs.

STAGE 1
Direct Feed

Service-line tee or hydrant → PSV-100 (holds ≥ 20 PSI) → 1.5" RPZ-100

STAGE 2
Pre-Filtration

3 HP boost pump, 200 µm auto-strainer, duplex 25 µm bags

STAGE 3
Ultrafiltration

4 × 60" PVDF modules, 0.02 µm, daily integrity test

STAGE 4 · NEW
Virus-Rated UV

186 mJ/cm² validated, duty + standby, live dose calculation

STAGE 5
Chlorine Residual

1.5–2.0 mg/L to protect the building's pipes — no contact tank

STAGE 6
Kitchen Booster

150-gal clearwell, duplex 3 HP VFD, 2" RPZ-602 → 60–75 PSI

Automatic lockouts: turbidity above 0.15 NTU, UV dose below 186 mJ/cm², chlorine outside 0.5–4.0 mg/L, or loss of power all close the building outlet XV-602.
Grease-trap rule: backwash and flush water always go to the sanitary cleanout downstream of the grease interceptor — never through it.
04 • DISINFECTION CREDIT

UV at 186 mJ/cm² Replaces the Contact Tank

EPA's LT2 UV dose table credits 4-log virus inactivation at 186 mJ/cm², based on adenovirus — the most UV-resistant virus. Rev B's 40 mJ/cm² only covered Giardia and Cryptosporidium.

Target MWTP-50 (Rev B) MWTP-50C (Rev C) How It's Proven
Crypto / GiardiaUF + UV 40 mJ/cm²UF + UV 186 mJ/cm²NSF 419 modules, daily pressure-decay test
BacteriaUF + chlorineUF + UV + chlorine residualOnline turbidity, Bac-T samples
Viruses (4-log)Chlorine CT in 600-gal ground tankUV validated at 186 mJ/cm²Live dose from intensity, UVT and flow
Building residualChlorine 1.5–2.2 mg/LChlorine 1.5–2.0 mg/L≥ 1.0 mg/L at the farthest tap
Sizing: 186 mJ/cm² at 40 GPM and 85% UVT. City water during an advisory typically runs 90–98% UVT.
Redundancy: two identical reactors, each able to carry full flow; the standby starts automatically on low dose.
Approval: Georgia EPD confirms UV as the virus barrier at the pre-application meeting.
05 • WATER SUPPLY

Port A for Boil Water Jobs, Port B for Outages

The trailer never pulls the city main below 20 PSI, and two closed building valves always separate raw water from treated water.

PORT A · BOIL WATER ADVISORY (MOST JOBS)

Pressurized Direct Feed

  • 1.5" valved tee installed on the service line by the restaurant's plumber at the site survey, or a permitted hydrant with the utility's meter and backflow device.
  • PSV-100 holds the upstream line at 20 PSI or more.
  • RPZ-100 (ASSE 1013) replaces the air gap; a flow switch alarms if its relief port discharges.
  • The intake pump only boosts what the UF needs — less power than drafting from a tank.
PORT B · ZERO MAIN PRESSURE

Tanker or Folding Break Tank

  • The intake pump drafts straight from a potable tanker — the tanker is the break tank.
  • If the tanker can't stay, the 550-gal folding tank from the PWR-25 kit box is set up and filled by drops.
  • A restaurant uses 4,000–8,000 gal/day, so one 4,000-gal drop covers most of a service day.
  • Port A stays closed and capped.
06 • THE TWO TRAILERS

20-ft Water Trailer + PWR-25 Generator Trailer

With the generator gone, the gooseneck nose holds the control panel, air and chemical cabinets — outside the operator space and over the hitch.

MWTP-50C Water Trailer (14-ft main + 6-ft gooseneck)
Gooseneck (exterior doors): PLC panel, duplex air, segregated chemical cabinets + exhaust870 lb
Front: PSV-100, RPZ-100, intake pump, strainer, bags · UF skid + integrity test1,340 lb
Over axles: 150-gal clearwell, duplex booster, test bench, eyewash840 lb
Rear & frame: UV ×2, dosing, piping, cord reel, 3,300 lb max aluminum tare4,260 lb
Road
7,310 lb
27% margin · ~1,170 lb pin (16%)
On site
8,660 lb
1,330 lb under 9,990 GVWR
PWR-25 Generator & Outage-Kit Trailer
25 kVA diesel, Tier 4 Final, sound-attenuated~3,100 lb
50A panel, 2 × 50 ft cords, ground rod120 lb
Kit box: 550-gal folding tank, suction hoses260 lb
Fuel transfer pump & spill kit60 lb
Total~3,540 lb

Integrated fuel tank and 110% spill base. Delivered by a second pickup and left on site — the driver doesn't stay.

07 • POWER

One 50A Cord Runs the Whole Plant

Every motor is 3 HP or smaller on a VFD that takes 240V single-phase power, so the plant runs from the same cord whether it's plugged into the restaurant or the PWR-25.

Average Load
7.45 kW
~31 A at 240V
Peak, With HVAC Shed
9.55 kW
Under the 9.6 kW (40 A) continuous limit
On PWR-25
~0.8 gal/hr
~37% load · about 19 gal/day
Boil Water Advisory (restaurant has power)

Plug into a 240V 50A receptacle installed at the site survey ($800–$2,000 by the restaurant's electrician). Silent, no exhaust, no fuel. Roughly 180 kWh/day on the restaurant's bill.

Power Outage

PWR-25 parks 10 ft or more from building openings and the dining area, ground rod driven, 50A cord to the same inlet. Its fuel tank covers more than two days between refuelings.

08 • BUILD COST

$219,420 Water Trailer + $34,500 PWR-25

Water trailer price includes PE engineering, UV validation submittal, integration and 15% contingency.

1. 20-ft aluminum gooseneck, HVAC, jacks, nose cabinet$28,500
2. PSV-100, RPZ-100, intake pump, strainer, bags$14,400
3. UF skid (4 modules) + integrity test$26,500
4. UV ×2 at 186 mJ/cm², UVT, dosing, chem cabinets$30,200
5. Clearwell, duplex booster, RPZ-602$14,800
6. Piping, 17 valves, bulkhead, hoses$15,500
7. PLC/HMI, telemetry, analyzers, safety$19,900
8. 50A shore inlet, cord reel, duplex air$6,000
Integration $22,000 · Engineering $13,000 · Contingency $28,620$63,620
Water trailer turnkey$219,420
PWR-25 — $34,500

25 kVA towable generator $27,500 · 50A panel & cords $1,800 · folding break tank $2,400 · hoses & adapters $1,200 · kit box $900 · fuel pump & spill kit $700

Configuration1 Unit2 Units
MWTP-50 (generator on board)$238,625$477,250
MWTP-50C + one shared PWR-25$253,920$473,340

About $15,000 more for one unit; less from the second unit on, because one PWR-25 backs up the whole restaurant fleet.

09 • ECONOMICS & RECOMMENDATION

Same Loan Coverage, Better Field Unit, Cheaper to Grow

Same pricing as the MWTP-50 — $1,800/yr single store or $1,500/yr per group store (max 10 per unit), $2,500 mobilization, $3,200/day — plus a generator add-on of $750 delivery + $400/day on outage jobs.

Year 1 Revenue
$111,800
8 locations · 6 events · 25 days
Year 1 EBITDA
$60,819
After direct and fixed costs
Loan (Existing Trucks)
$234,001
$2,933/mo · 8.75% · 10 yr
Year 1 DSCR
1.73×
1.40× with a new truck
Build the MWTP-50C when…

AmeriPro plans to grow past one restaurant unit, or can use the PWR-25 on other work between emergencies.

For a single unit…

Costs and loan coverage are about even with the MWTP-50; the lighter trailer and 1.5-hour setup make the MWTP-50C the better field unit.

The hospital MWTP-250…

Keeps its onboard 80 kW generator and contact tank — hospital jobs are where power and water fail together.

Next steps: Georgia EPD pre-application (UV virus credit + RPZ direct feed) • UV reactor validation quotes • builder's certified tare • 50A outlet and service-tee scope in site surveys.