ONLINE • ALL BARRIERS GREEN MODEL: MWTP-250-GN36 · REV B

MWTP-250: 36-ft Gooseneck Emergency Water Treatment Facility

Interactive Floorplan, SCADA Process Simulator & Contact-Time (CT) Calculator

Building Flow
180 GPM
259,200 GPD
UF Permeate Turbidity
0.02 NTU
Daily integrity test: PASS
Chlorine CT (4-log virus)
CT 12.5
Required 4.0 · Cl₂ 1.5 mg/L
Building Pressure (PT-603)
70 PSI
2 Duty VFDs Active
Generator Load & Autonomy
30 kW
60 hrs (2.5 gal/hr)
Weight on Trailer
28,420 lbs
Ground tanks deployed

Interactive 36-ft Gooseneck Trailer Floorplan (Click any skid to inspect)

Fire-separated gooseneck machinery compartment + 28-ft main deck (9.5 ft clear) • 96" interior width • Triple 10,000-lb axles • Ground tanks shown below

Raw Water UF Permeate Chlorine Contact Potable Pressurized Waste (to sewer)
8 ft Gooseneck (machinery) 28 ft Main Deck (Total 36 ft Length × 8 ft Width) Hitch Pin ~5,300 lb 3 × 10K-LB AXLES · 30K GVWR FIREWALL 32" OPERATOR WALKWAY & OVERHEAD PIPE RACK 80 kW DIESEL GENERATOR Tier 4 Sound-Atten 150-Gal Belly Tank (~48 hr at full load) Exterior doors no crew space DUPLEX AIR 2 × 2 HP Receiver + Dryer PLC / HMI · WET LAB Turbidity, UVT, Cl₂ / pH / Temp Live CT Calculation + Eyewash / Safety Station 1–2. INTAKE & PRE-FILTER P-101 Intake Pump (15 HP) 200 µm Auto Strainer 25 µm Bags → PACl Mixer 3. ULTRAFILTRATION + DAILY DIT Train A: 125G Train B: 125G 4. UV ×3 · 5. CHLORINE · CHEM ROOM 2 Duty + 1 Standby UV ≥ 40 mJ/cm² + UVT + UF Backwash Pump OXID. ACID PACl 500-GAL BAFFLED CLEARWELL Level: 85% (425 Gal) 6. BUILDING BOOSTER 3× 15 HP VFD (2+1) + P-401 CT Transfer + ASSE 1013 RPZ REAR CAMLOCK BULKHEAD HYDRANT ≥ 20 PSI via meter + backflow + PSV-100 — or TANKER TK-100 RAW 3,000-Gal Break Tank (air-gap fill) TK-401 BAFFLED CONTACT TANK (3,000 GAL) OUT: 3" Bldg OUT: Waste (dechlor → sewer)
UF-201A/B • STAGE 3

Hollow-Fiber Ultrafiltration Skid

Road: 3,300 lb | Wet: 3,900 lb

Location: Power:

Facility Demand, Water Conditions & CT Simulator

One trailer serves one building connection. Adjust that building's peak demand and the water conditions.

Facility Peak Domestic Demand 180 GPM
10 GPM (restaurant) 320 GPM (over capacity)
Water Temperature 15 °C
1 °C (winter) 30 °C (summer)
Raw Water Turbidity (NTU) 12 NTU
1 NTU (clear main) 80 NTU (needs pretreatment)
Building Pressure Setpoint (PT-603) 70 PSI
45 PSI (1-story) 85 PSI (multi-story hospital)
Plant Capacity Used (180 / 250 GPM) 72% Load